Accutane Swollen Lips - Buy accutane Online

Viagra Make Me Happy


Viagra Make Me Happy Viagra Make Me Happy

Carmen Diet Electra Pill


Carmen Diet Electra Pill Carmen Diet Electra Pill

Happy Birthday Viagra Target


Happy Birthday Viagra Target Happy Birthday Viagra Target

Gatto Di Cipro


Gatto Di Cipro Gatto Di Cipro

Nizoral Shampoo Bottle Size


Nizoral Shampoo Bottle Size Nizoral Shampoo Bottle Size


use of isotretinoin capsules usp 30 mg
isotretinoina fases
isotretinoina nombres comerciales en mexico
tudo sobre o tratamento com isotretinoina
accutane stays in your system
excessive drinking on accutane
treating dry skin from accutane
buy accutane online with no prescription
accutane bleeding
isotretinoin dergboadre price
accutane pill identification
accutane canberra
accutane and doxycycline
accutane 10mg twice a week
isotretinoin chest acne
como comercializar isotretinoina
can you eat dairy while on accutane
difference entre roaccutane et roaccutane
disparition effets secondaires roaccutane
isotretinoina diabetes
isotretinoina passo a passo
isotretinoina perigo
price of accutane in canada
what happens to skin after accutane
isotretinoin angrepille
isotretinoin effectiveness
accutane month 4 results
low dose isotretinoin mild acne
does accutane cause heat rash
accutane skin pigmentation
isotretinoina legge
accutane increased appetite
accutane greasy skin
isotretinoin 5mg uk
isotretinoin reactii adverse

Home Page |  About Us |  Our Links |  Contact Us  

 

MAIN MENU
-About Us
-History
-Fire Prevention
-Announcements
-Kids Corner
-Volunteers Join Us








Welcome to the Towaco Volunteer Fire Department Information Page.
Help Us, Help You.
Please donate here and thank you for your support.


     The new Towaco Fire House replaces an existing 60-year-old fire house, which was in very poor condition. The old firehouse had proven too small for contemporary fire trucks and too costly to renovate to accommodate them. Since much of the property was situated in a flood plain and the driveway had to be close to an existing intersection, the area available for the building was geographically challenging.

     The 12,000-square-feet of area in this fully sprinkler equipped, barrier-free building is distributed over three floors. The building program consisted of two types of spaces: those associated with the day-to-day operation of this volunteer Fire Department (Apparatus Room, Departmental Offices, Equipment and Locker rooms, and Conference Room), and those associated with the building's role as a site of social gatherings and as the host of community activities. To accommodate the owner's limited construction budget, it was concluded early on that it would not be possible to finish the entire building initially. Since Fire Service could not be compromised, the finishing of the non-essential spaces was postponed. The form of the building is very simple: in Plan, a simple rectangle; in Section, a simple gable. Four large dormers bring daylight into the multipurpose room, located on the third floor, under the gable roof and it's exposed steel structure. 

     The high garage bays occupy the middle of the building, with the offices wrapping around them on the first floor, and the dormitories wrapping around them on the second. The two sets of fire stairs straddle the garage. The facade consists primarily of ground face concrete block in two colors, aligned with the glazed and unglazed portions of the garage doors, respectively. Various rooftop exhaust stacks are clustered in chimney-like enclosures at the gable ends. A cupola tops the building, bringing natural light deep into the Multipurpose Room during the day, and acting as a lantern at night. In addition to the obvious features of a fire station, the project contains a variety of special materials and systems, including greater than normal lateral resistance, as required for such a building in a seismically-active area, checker-plate traction pads, a carbon monoxide exhaust system in the garage, an emergency generator, and an interface enabling emergency operation of the nearby traffic signal. Rather than locate the air handlers on top of the roof where they would have been visible, they were hung underneath the roof, above suspended acoustic ceilings.
 

Copyright Towaco Volunteer Fire Department. All Rights Reserved.