Cialis Daily Use Packaging - Buy cialis Online

Counterfeit Viagra Color


Counterfeit Viagra Color Counterfeit Viagra Color

Allegra Active Ingredient


Allegra Active Ingredient Allegra Active Ingredient

Cialis Yellow Package


Cialis Yellow Package Cialis Yellow Package

Cytotec Precio En Farmacias


Cytotec Precio En Farmacias Cytotec Precio En Farmacias

Celebrex Pronunciation


Celebrex Pronunciation Celebrex Pronunciation


will 5 mg cialis get me hard
cialis 5 mg prezzi in farmacia
is it ok to take cialis with avodart
prescriptions in costa rica cialis
cialis e allopurinolo
who has the cheapest generic cialis
can i use cialis for premature ejaculation
free coupon for medication cialis
5 mg cialis why
cialis 20 mg doz
whats better cialis or kamagra
generic 50 mg cialis online from canada
cialis rembourse
20 cialis vs 40 cialis
cialis shoppers drugmart winnipeg
cialis causing muscle pain
cialis black and cialis super active difference
adcirca instead of cialis
walgreens cialis charge
are you supposed to take cialis daily or just as needed
how to tell the difference between counterfeit cialis
walmart cheap cialis
cialis tiempo en hacer efecto
is safe to take muscle relaxer with cialis
cialis pills for sale canada
does a double dose of cialis work
peak blood levels after cialis
how long for cialis to start
cialispeak effect
how long can a man go with cialis
the concept of privatisation and commercialisation.
cialis soft tabs
side effects olmetec 20 mg and cialis 5mg
when to stop taking cialis before surgery
can i split cialis split pills

Home Page |  About Us |  Our Links |  Contact Us  

 

MAIN MENU
-About Us
-History
-Fire Prevention
-Announcements
-Kids Corner
-Volunteers Join Us








Welcome to the Towaco Volunteer Fire Department Information Page.
Help Us, Help You.
Please donate here and thank you for your support.


     The new Towaco Fire House replaces an existing 60-year-old fire house, which was in very poor condition. The old firehouse had proven too small for contemporary fire trucks and too costly to renovate to accommodate them. Since much of the property was situated in a flood plain and the driveway had to be close to an existing intersection, the area available for the building was geographically challenging.

     The 12,000-square-feet of area in this fully sprinkler equipped, barrier-free building is distributed over three floors. The building program consisted of two types of spaces: those associated with the day-to-day operation of this volunteer Fire Department (Apparatus Room, Departmental Offices, Equipment and Locker rooms, and Conference Room), and those associated with the building's role as a site of social gatherings and as the host of community activities. To accommodate the owner's limited construction budget, it was concluded early on that it would not be possible to finish the entire building initially. Since Fire Service could not be compromised, the finishing of the non-essential spaces was postponed. The form of the building is very simple: in Plan, a simple rectangle; in Section, a simple gable. Four large dormers bring daylight into the multipurpose room, located on the third floor, under the gable roof and it's exposed steel structure. 

     The high garage bays occupy the middle of the building, with the offices wrapping around them on the first floor, and the dormitories wrapping around them on the second. The two sets of fire stairs straddle the garage. The facade consists primarily of ground face concrete block in two colors, aligned with the glazed and unglazed portions of the garage doors, respectively. Various rooftop exhaust stacks are clustered in chimney-like enclosures at the gable ends. A cupola tops the building, bringing natural light deep into the Multipurpose Room during the day, and acting as a lantern at night. In addition to the obvious features of a fire station, the project contains a variety of special materials and systems, including greater than normal lateral resistance, as required for such a building in a seismically-active area, checker-plate traction pads, a carbon monoxide exhaust system in the garage, an emergency generator, and an interface enabling emergency operation of the nearby traffic signal. Rather than locate the air handlers on top of the roof where they would have been visible, they were hung underneath the roof, above suspended acoustic ceilings.
 

Copyright Towaco Volunteer Fire Department. All Rights Reserved.