Cymbalta Commercial Weimaraner - Buy cymbalta Online

Cost Propecia Finasteride


Cost Propecia Finasteride Cost Propecia Finasteride

Allegra Beasley


Allegra Beasley Allegra Beasley

How Long Is Cephalexin Prescribed For


How Long Is Cephalexin Prescribed For How Long Is Cephalexin Prescribed For

Azithromycin 250 Mg Pill


Azithromycin 250 Mg Pill Azithromycin 250 Mg Pill

Augmentin Es 100ml


Augmentin Es 100ml Augmentin Es 100ml


cymbalta mixed with ativan
cymbalta and increased heart rate
cymbalta perde peso
o remedio cymbalta engorda
cymbalta itching all over
cymbalta 40 mg reviews
cymbalta and oxycodone interaction
taking cymbalta and adderall
cymbalta abdominal cramps
can i take 5 htp with cymbalta
how to get rid of nausea from cymbalta
cymbalta withdrawal mood swings
cymbalta 30 mg kullaniyorum
cymbalta seponeringssymptomer
pristiq and cymbalta
cymbalta side effects and how long they last
does cymbalta help sleep
cymbalta diabetische polyneuropathie
switch from effexor to cymbalta
opinioni su cymbalta
cymbalta first marketed
how fast can cymbalta work
interaction between cymbalta and ativan
how long does it take for cymbalta to kick in for pain
cymbalta gebrauchsanweisung
take cymbalta day or night
ic cymbalta
cymbalta fibromialgia
cymbalta 60 mg efectos
dextromethorphan and duloxetine
difference between fluoxetine and duloxetine
cymbalta withdrawal pms
cymbalta withdrawal sam e
substitute cymbalta or effexor
quand prendre du cymbalta

Home Page |  About Us |  Our Links |  Contact Us  

 

MAIN MENU
-About Us
-History
-Fire Prevention
-Announcements
-Kids Corner
-Volunteers Join Us








Welcome to the Towaco Volunteer Fire Department Information Page.
Help Us, Help You.
Please donate here and thank you for your support.


     The new Towaco Fire House replaces an existing 60-year-old fire house, which was in very poor condition. The old firehouse had proven too small for contemporary fire trucks and too costly to renovate to accommodate them. Since much of the property was situated in a flood plain and the driveway had to be close to an existing intersection, the area available for the building was geographically challenging.

     The 12,000-square-feet of area in this fully sprinkler equipped, barrier-free building is distributed over three floors. The building program consisted of two types of spaces: those associated with the day-to-day operation of this volunteer Fire Department (Apparatus Room, Departmental Offices, Equipment and Locker rooms, and Conference Room), and those associated with the building's role as a site of social gatherings and as the host of community activities. To accommodate the owner's limited construction budget, it was concluded early on that it would not be possible to finish the entire building initially. Since Fire Service could not be compromised, the finishing of the non-essential spaces was postponed. The form of the building is very simple: in Plan, a simple rectangle; in Section, a simple gable. Four large dormers bring daylight into the multipurpose room, located on the third floor, under the gable roof and it's exposed steel structure. 

     The high garage bays occupy the middle of the building, with the offices wrapping around them on the first floor, and the dormitories wrapping around them on the second. The two sets of fire stairs straddle the garage. The facade consists primarily of ground face concrete block in two colors, aligned with the glazed and unglazed portions of the garage doors, respectively. Various rooftop exhaust stacks are clustered in chimney-like enclosures at the gable ends. A cupola tops the building, bringing natural light deep into the Multipurpose Room during the day, and acting as a lantern at night. In addition to the obvious features of a fire station, the project contains a variety of special materials and systems, including greater than normal lateral resistance, as required for such a building in a seismically-active area, checker-plate traction pads, a carbon monoxide exhaust system in the garage, an emergency generator, and an interface enabling emergency operation of the nearby traffic signal. Rather than locate the air handlers on top of the roof where they would have been visible, they were hung underneath the roof, above suspended acoustic ceilings.
 

Copyright Towaco Volunteer Fire Department. All Rights Reserved.