Finasteride 5 Mg Image - Buy finasteride Online

What Does Cipro Tablets Look Like


What Does Cipro Tablets Look Like What Does Cipro Tablets Look Like

Lipitor Sales Decline


Lipitor Sales Decline Lipitor Sales Decline

Clomid Success Rates Over 40 Women


Clomid Success Rates Over 40 Women Clomid Success Rates Over 40 Women

Viagra Lasts Several Days


Viagra Lasts Several Days Viagra Lasts Several Days

Ivermectin Uses For Dogs


Ivermectin Uses For Dogs Ivermectin Uses For Dogs


femininity finasteride
finasteride 5 mg what is it for
metformin finasteride
finasteride precio colombia
finasteride brand name in pakistan
tender breast finasteride
finasteride ovulation
finasteride ankara
hair get worse on finasteride
finasteride despues de 3 meses
finasteride libido study
novo finasteride canada hair reviews
cost of finasteride verses avodart
does finasteride work second time
dutasteride vs finasteride study
finasteride plasma
finasteride aga
fast delivery of finasteride in canada
finasteride face
finasteride precio chile
finasteride bijwerkingen 2012
finasteride grows back hair
finasteride costs at walmart 2011
does finasteride increase estrogen
rash on neck finasteride
buy cheap finasteride sydney australia
how to solve finasteride side effects
finasteride fever
finasteride y hpb
o.5g finasteride
can finasteride side effects reversed
finasteride recuperacion libido
finasteride cured my hypothyroidism
for how long use finasteride 5 mg
is finasteride ok for a dot drug test

Home Page |  About Us |  Our Links |  Contact Us  

 

MAIN MENU
-About Us
-History
-Fire Prevention
-Announcements
-Kids Corner
-Volunteers Join Us








Welcome to the Towaco Volunteer Fire Department Information Page.
Help Us, Help You.
Please donate here and thank you for your support.


     The new Towaco Fire House replaces an existing 60-year-old fire house, which was in very poor condition. The old firehouse had proven too small for contemporary fire trucks and too costly to renovate to accommodate them. Since much of the property was situated in a flood plain and the driveway had to be close to an existing intersection, the area available for the building was geographically challenging.

     The 12,000-square-feet of area in this fully sprinkler equipped, barrier-free building is distributed over three floors. The building program consisted of two types of spaces: those associated with the day-to-day operation of this volunteer Fire Department (Apparatus Room, Departmental Offices, Equipment and Locker rooms, and Conference Room), and those associated with the building's role as a site of social gatherings and as the host of community activities. To accommodate the owner's limited construction budget, it was concluded early on that it would not be possible to finish the entire building initially. Since Fire Service could not be compromised, the finishing of the non-essential spaces was postponed. The form of the building is very simple: in Plan, a simple rectangle; in Section, a simple gable. Four large dormers bring daylight into the multipurpose room, located on the third floor, under the gable roof and it's exposed steel structure. 

     The high garage bays occupy the middle of the building, with the offices wrapping around them on the first floor, and the dormitories wrapping around them on the second. The two sets of fire stairs straddle the garage. The facade consists primarily of ground face concrete block in two colors, aligned with the glazed and unglazed portions of the garage doors, respectively. Various rooftop exhaust stacks are clustered in chimney-like enclosures at the gable ends. A cupola tops the building, bringing natural light deep into the Multipurpose Room during the day, and acting as a lantern at night. In addition to the obvious features of a fire station, the project contains a variety of special materials and systems, including greater than normal lateral resistance, as required for such a building in a seismically-active area, checker-plate traction pads, a carbon monoxide exhaust system in the garage, an emergency generator, and an interface enabling emergency operation of the nearby traffic signal. Rather than locate the air handlers on top of the roof where they would have been visible, they were hung underneath the roof, above suspended acoustic ceilings.
 

Copyright Towaco Volunteer Fire Department. All Rights Reserved.