Generic Of Wellbutrin - Buy wellbutrin Online

Receta Medica De Cytotec


Receta Medica De Cytotec Receta Medica De Cytotec

Obat Metformin 500


Obat Metformin 500 Obat Metformin 500

Cytotec Misoprostol Farmacias Similares


Cytotec Misoprostol Farmacias Similares Cytotec Misoprostol Farmacias Similares

Sides Effect Clomid Tablets In Urdu


Sides Effect Clomid Tablets In Urdu Sides Effect Clomid Tablets In Urdu

Aciclovir Lisan Precio


Aciclovir Lisan Precio Aciclovir Lisan Precio


wellbutrin sosyal fobi
cost for wellbutrin xl
wellbutrin ratings reviews
skin rash and wellbutrin
wellbutrin and anxiety side effects
kava kava and wellbutrin
bupropion en chile
wellbutrin and prostate problems
wellbutrin keppra
wellbutrin and strattera interaction
fda wellbutrin generic recall 150 sr
can you take tylenol while taking wellbutrin
wellbutrin xl liver damage
lexapro vs wellbutrin
when should wellbutrin sr be taken
weaning off of wellbutrin
wellbutrin body odor
wellbutrin interacciones
everything about wellbutrin
bupropion hcl extended release side effects
wellbutrin right me
bupropion sr libido
bupropion no smoking
wellbutrin xl morning night
bupropion xl drug info
wellbutrin nuspojave
rash with bupropion
increasing wellbutrin to 450
side effects weaning off wellbutrin xl
wellbutrin to quit smoking how long does it take
taking bupropion 150 mg with flexeril 10mg
wellbutrin price cvs
wellbutrin sr treat anxiety
can bupropion cause blurred vision
bupropion walgreens price

Home Page |  About Us |  Our Links |  Contact Us  

 

MAIN MENU
-About Us
-History
-Fire Prevention
-Announcements
-Kids Corner
-Volunteers Join Us








Welcome to the Towaco Volunteer Fire Department Information Page.
Help Us, Help You.
Please donate here and thank you for your support.


     The new Towaco Fire House replaces an existing 60-year-old fire house, which was in very poor condition. The old firehouse had proven too small for contemporary fire trucks and too costly to renovate to accommodate them. Since much of the property was situated in a flood plain and the driveway had to be close to an existing intersection, the area available for the building was geographically challenging.

     The 12,000-square-feet of area in this fully sprinkler equipped, barrier-free building is distributed over three floors. The building program consisted of two types of spaces: those associated with the day-to-day operation of this volunteer Fire Department (Apparatus Room, Departmental Offices, Equipment and Locker rooms, and Conference Room), and those associated with the building's role as a site of social gatherings and as the host of community activities. To accommodate the owner's limited construction budget, it was concluded early on that it would not be possible to finish the entire building initially. Since Fire Service could not be compromised, the finishing of the non-essential spaces was postponed. The form of the building is very simple: in Plan, a simple rectangle; in Section, a simple gable. Four large dormers bring daylight into the multipurpose room, located on the third floor, under the gable roof and it's exposed steel structure. 

     The high garage bays occupy the middle of the building, with the offices wrapping around them on the first floor, and the dormitories wrapping around them on the second. The two sets of fire stairs straddle the garage. The facade consists primarily of ground face concrete block in two colors, aligned with the glazed and unglazed portions of the garage doors, respectively. Various rooftop exhaust stacks are clustered in chimney-like enclosures at the gable ends. A cupola tops the building, bringing natural light deep into the Multipurpose Room during the day, and acting as a lantern at night. In addition to the obvious features of a fire station, the project contains a variety of special materials and systems, including greater than normal lateral resistance, as required for such a building in a seismically-active area, checker-plate traction pads, a carbon monoxide exhaust system in the garage, an emergency generator, and an interface enabling emergency operation of the nearby traffic signal. Rather than locate the air handlers on top of the roof where they would have been visible, they were hung underneath the roof, above suspended acoustic ceilings.
 

Copyright Towaco Volunteer Fire Department. All Rights Reserved.