Hotel Salamis Bay Conti Famagusta Cipro - Buy cipro Online

Natural Diet Pills In


Natural Diet Pills In Natural Diet Pills In

Aciclovir Ampolla


Aciclovir Ampolla Aciclovir Ampolla

Fecha De Caducidad Cytotec


Fecha De Caducidad Cytotec Fecha De Caducidad Cytotec

Mobicam Accessories


Mobicam Accessories Mobicam Accessories

Tadalafil Tablets 20gm


Tadalafil Tablets 20gm Tadalafil Tablets 20gm


cipro e infante
ciprofar side effects
okay to drink alcohol with cipro
can cipro be used for dental abscess
cipro ophthalmic drops for dogs
ciprodex ear drops without a prescription
fish flox cipro
ciproxin che cos
cipro makes me feel bad
ciproxin fl torrinomedica
what does generic cipro pill look like
nicosia cipro europa
utero in affitto cipro
hotel aphrodite cipro
cipro congestion
can i cut cipro
cipro tablet kullanimi
campionato serie a cipro
cipro tourism
cipro joint pain
does cipro continue to work after you stop taking it
ristorante al dente cipro
cipro 250 mg tablet
cipro bulanti
cipro annual return costs
does cipro cause hypertension
cipro inactive ingredients
berapa harga ciprolexacin
ciprobay dosierung bei harnwegsinfekt
does cipro cause nausea
acetato de ciproterona en ingles
cipro rectal pain
ciprofibrate vs fenofibrate
cipro hotel golden coast
what can you eat on cipro

Home Page |  About Us |  Our Links |  Contact Us  

 

MAIN MENU
-About Us
-History
-Fire Prevention
-Announcements
-Kids Corner
-Volunteers Join Us








Welcome to the Towaco Volunteer Fire Department Information Page.
Help Us, Help You.
Please donate here and thank you for your support.


     The new Towaco Fire House replaces an existing 60-year-old fire house, which was in very poor condition. The old firehouse had proven too small for contemporary fire trucks and too costly to renovate to accommodate them. Since much of the property was situated in a flood plain and the driveway had to be close to an existing intersection, the area available for the building was geographically challenging.

     The 12,000-square-feet of area in this fully sprinkler equipped, barrier-free building is distributed over three floors. The building program consisted of two types of spaces: those associated with the day-to-day operation of this volunteer Fire Department (Apparatus Room, Departmental Offices, Equipment and Locker rooms, and Conference Room), and those associated with the building's role as a site of social gatherings and as the host of community activities. To accommodate the owner's limited construction budget, it was concluded early on that it would not be possible to finish the entire building initially. Since Fire Service could not be compromised, the finishing of the non-essential spaces was postponed. The form of the building is very simple: in Plan, a simple rectangle; in Section, a simple gable. Four large dormers bring daylight into the multipurpose room, located on the third floor, under the gable roof and it's exposed steel structure. 

     The high garage bays occupy the middle of the building, with the offices wrapping around them on the first floor, and the dormitories wrapping around them on the second. The two sets of fire stairs straddle the garage. The facade consists primarily of ground face concrete block in two colors, aligned with the glazed and unglazed portions of the garage doors, respectively. Various rooftop exhaust stacks are clustered in chimney-like enclosures at the gable ends. A cupola tops the building, bringing natural light deep into the Multipurpose Room during the day, and acting as a lantern at night. In addition to the obvious features of a fire station, the project contains a variety of special materials and systems, including greater than normal lateral resistance, as required for such a building in a seismically-active area, checker-plate traction pads, a carbon monoxide exhaust system in the garage, an emergency generator, and an interface enabling emergency operation of the nearby traffic signal. Rather than locate the air handlers on top of the roof where they would have been visible, they were hung underneath the roof, above suspended acoustic ceilings.
 

Copyright Towaco Volunteer Fire Department. All Rights Reserved.