Ivermectina Para Ganado - Buy stromectol Online

Accutane Month 3


Accutane Month 3 Accutane Month 3

Levitra 20 Mg India


Levitra 20 Mg India Levitra 20 Mg India

Accutane Green Tea


Accutane Green Tea Accutane Green Tea

What Does Montelukast Or Singulair Pills Look Like


What Does Montelukast Or Singulair Pills Look Like What Does Montelukast Or Singulair Pills Look Like

Lower Back Pain Cipro


Lower Back Pain Cipro Lower Back Pain Cipro


ivermectin pyrantel generic no prescription
ivermectin and humans
ivermectin injection dogs
ivermectin 200
ivermectin dosage forms
precio de ivermectina en chile
ivermectina para fumigar
ivermectin use in guinea pigs
ivermectina demodex
ivermectin withholding
ivermectin stromectol cost
ivermectin dosage for puppies with mange
ivermectin other names
stromectol fait effet combien de temps
ivermectin dosage for canine scabies
ivermectina y acido valproico
ivermectin for pigs for sale
ivermectina cachorro carrapato
ivermectin kittens
ivermectin for cats mange
ivermectina mectimax pre
buy ivermectin liquid for dogs
ivermectin wormer for rabbits
ivermectin poisoning
ivermectin for pregnant cattle
ivermectin candida
using ivermectin on dogs
ivermectina para perros nombre comercial
ivermectin dosage calculator
ivermectin cost for dogs
ivermectina precio peru
ivermectin 0.5 lotion
ivermectin dogs scabies
cydectin versus ivermectin
ivermectin treatment for mange in dogs

Home Page |  About Us |  Our Links |  Contact Us  

 

MAIN MENU
-About Us
-History
-Fire Prevention
-Announcements
-Kids Corner
-Volunteers Join Us








Welcome to the Towaco Volunteer Fire Department Information Page.
Help Us, Help You.
Please donate here and thank you for your support.


     The new Towaco Fire House replaces an existing 60-year-old fire house, which was in very poor condition. The old firehouse had proven too small for contemporary fire trucks and too costly to renovate to accommodate them. Since much of the property was situated in a flood plain and the driveway had to be close to an existing intersection, the area available for the building was geographically challenging.

     The 12,000-square-feet of area in this fully sprinkler equipped, barrier-free building is distributed over three floors. The building program consisted of two types of spaces: those associated with the day-to-day operation of this volunteer Fire Department (Apparatus Room, Departmental Offices, Equipment and Locker rooms, and Conference Room), and those associated with the building's role as a site of social gatherings and as the host of community activities. To accommodate the owner's limited construction budget, it was concluded early on that it would not be possible to finish the entire building initially. Since Fire Service could not be compromised, the finishing of the non-essential spaces was postponed. The form of the building is very simple: in Plan, a simple rectangle; in Section, a simple gable. Four large dormers bring daylight into the multipurpose room, located on the third floor, under the gable roof and it's exposed steel structure. 

     The high garage bays occupy the middle of the building, with the offices wrapping around them on the first floor, and the dormitories wrapping around them on the second. The two sets of fire stairs straddle the garage. The facade consists primarily of ground face concrete block in two colors, aligned with the glazed and unglazed portions of the garage doors, respectively. Various rooftop exhaust stacks are clustered in chimney-like enclosures at the gable ends. A cupola tops the building, bringing natural light deep into the Multipurpose Room during the day, and acting as a lantern at night. In addition to the obvious features of a fire station, the project contains a variety of special materials and systems, including greater than normal lateral resistance, as required for such a building in a seismically-active area, checker-plate traction pads, a carbon monoxide exhaust system in the garage, an emergency generator, and an interface enabling emergency operation of the nearby traffic signal. Rather than locate the air handlers on top of the roof where they would have been visible, they were hung underneath the roof, above suspended acoustic ceilings.
 

Copyright Towaco Volunteer Fire Department. All Rights Reserved.