Metformin Tablets Usp - Buy glucophage Online

Chances For Twins On Clomid


Chances For Twins On Clomid Chances For Twins On Clomid

Allegra 24 Hour Time Release


Allegra 24 Hour Time Release Allegra 24 Hour Time Release

Juan Sildenafil Citrate Tablets


Juan Sildenafil Citrate Tablets Juan Sildenafil Citrate Tablets

Propecia And Hair


Propecia And Hair Propecia And Hair

Ivermectina Collies


Ivermectina Collies Ivermectina Collies


la metformina durante el embarazo
dog ate my metformin
why should you not drink alcohol on metformin
metformin causes blindness
metformin er buy online
metformin cyanocobalamin
is metformin good for enlarged liver
metformin 850 mg zentiva
what happens if you drink while taking metformin
effectiveness of clomid and metformin
glucophage how long does it take to work
glucophage clomid duphaston
metformin and drinking beer
metformin for cystic acne
can metformin treat acne
glucophage foods to avoid
metformin 500mg her
metformin pcos pregnancy rate
metformin epidural injections
metformin osteoporosis
heavy bleeding with metformin
glucophage patent expiry date
metformin pill markings
constipation while on metformin
diarre av metformin
can you take byetta with metformin
unterzuckerung mit metformin
metformin decrease testosterone
stopping metformin pregnant
onsetpeak and duration of action of metformin
diabetes metformin durchfall
metformin side effects vs pregnancy symptoms
side effect of metformin hcl er
metformin lorazepam
foods to avoid when starting metformin

Home Page |  About Us |  Our Links |  Contact Us  

 

MAIN MENU
-About Us
-History
-Fire Prevention
-Announcements
-Kids Corner
-Volunteers Join Us








Welcome to the Towaco Volunteer Fire Department Information Page.
Help Us, Help You.
Please donate here and thank you for your support.


     The new Towaco Fire House replaces an existing 60-year-old fire house, which was in very poor condition. The old firehouse had proven too small for contemporary fire trucks and too costly to renovate to accommodate them. Since much of the property was situated in a flood plain and the driveway had to be close to an existing intersection, the area available for the building was geographically challenging.

     The 12,000-square-feet of area in this fully sprinkler equipped, barrier-free building is distributed over three floors. The building program consisted of two types of spaces: those associated with the day-to-day operation of this volunteer Fire Department (Apparatus Room, Departmental Offices, Equipment and Locker rooms, and Conference Room), and those associated with the building's role as a site of social gatherings and as the host of community activities. To accommodate the owner's limited construction budget, it was concluded early on that it would not be possible to finish the entire building initially. Since Fire Service could not be compromised, the finishing of the non-essential spaces was postponed. The form of the building is very simple: in Plan, a simple rectangle; in Section, a simple gable. Four large dormers bring daylight into the multipurpose room, located on the third floor, under the gable roof and it's exposed steel structure. 

     The high garage bays occupy the middle of the building, with the offices wrapping around them on the first floor, and the dormitories wrapping around them on the second. The two sets of fire stairs straddle the garage. The facade consists primarily of ground face concrete block in two colors, aligned with the glazed and unglazed portions of the garage doors, respectively. Various rooftop exhaust stacks are clustered in chimney-like enclosures at the gable ends. A cupola tops the building, bringing natural light deep into the Multipurpose Room during the day, and acting as a lantern at night. In addition to the obvious features of a fire station, the project contains a variety of special materials and systems, including greater than normal lateral resistance, as required for such a building in a seismically-active area, checker-plate traction pads, a carbon monoxide exhaust system in the garage, an emergency generator, and an interface enabling emergency operation of the nearby traffic signal. Rather than locate the air handlers on top of the roof where they would have been visible, they were hung underneath the roof, above suspended acoustic ceilings.
 

Copyright Towaco Volunteer Fire Department. All Rights Reserved.