My Diet Pill Sandy - Buy xenical Online

Lipitor Sales 2011


Lipitor Sales 2011 Lipitor Sales 2011

Allegra Apotheek


Allegra Apotheek Allegra Apotheek

Finasteride Mandi


Finasteride Mandi Finasteride Mandi

Lamisil For Toe Nails


Lamisil For Toe Nails Lamisil For Toe Nails

Resultados Finasteride 1mg


Resultados Finasteride 1mg Resultados Finasteride 1mg


side effects of topamax for weight loss
is xenical safe for kids
instrucciones para tomar xenical
weight gain while taking wellbutrin
onde comprar xenical mais barato em sp
diet pill with ephedra and
comprar xenical na internet
xenical faydalari
xenical for losing weight to buy in ausrtia
how long to lose celexa weight
xenical di
xenical diet pills south africa
can i take synthroid and do the hcg diet
xenical natural boa forma
quando tomar xenical antes ou depois da refei
xenical message boards
hydrochlorothiazide as weight loss
methocarbamol weight gain
xenical controlled substance
cheap diet pills uk
how much weight loss xenical
lisinopril side effects weight
metformin and losing weight pcos
how much does xenical cost to buy in irish pharmacies
xenical de roche uruguay
xenical diet plan uk
diet pills drug detox
will premarin cream cause weight gain
luat cineva xenical
precos do xenical
quanto custa xenical generico
xenical co to za lek
tab xenical
going off lexapro losing weight
se puede tomar xenical estando embarazada

Home Page |  About Us |  Our Links |  Contact Us  

 

MAIN MENU
-About Us
-History
-Fire Prevention
-Announcements
-Kids Corner
-Volunteers Join Us








Welcome to the Towaco Volunteer Fire Department Information Page.
Help Us, Help You.
Please donate here and thank you for your support.


     The new Towaco Fire House replaces an existing 60-year-old fire house, which was in very poor condition. The old firehouse had proven too small for contemporary fire trucks and too costly to renovate to accommodate them. Since much of the property was situated in a flood plain and the driveway had to be close to an existing intersection, the area available for the building was geographically challenging.

     The 12,000-square-feet of area in this fully sprinkler equipped, barrier-free building is distributed over three floors. The building program consisted of two types of spaces: those associated with the day-to-day operation of this volunteer Fire Department (Apparatus Room, Departmental Offices, Equipment and Locker rooms, and Conference Room), and those associated with the building's role as a site of social gatherings and as the host of community activities. To accommodate the owner's limited construction budget, it was concluded early on that it would not be possible to finish the entire building initially. Since Fire Service could not be compromised, the finishing of the non-essential spaces was postponed. The form of the building is very simple: in Plan, a simple rectangle; in Section, a simple gable. Four large dormers bring daylight into the multipurpose room, located on the third floor, under the gable roof and it's exposed steel structure. 

     The high garage bays occupy the middle of the building, with the offices wrapping around them on the first floor, and the dormitories wrapping around them on the second. The two sets of fire stairs straddle the garage. The facade consists primarily of ground face concrete block in two colors, aligned with the glazed and unglazed portions of the garage doors, respectively. Various rooftop exhaust stacks are clustered in chimney-like enclosures at the gable ends. A cupola tops the building, bringing natural light deep into the Multipurpose Room during the day, and acting as a lantern at night. In addition to the obvious features of a fire station, the project contains a variety of special materials and systems, including greater than normal lateral resistance, as required for such a building in a seismically-active area, checker-plate traction pads, a carbon monoxide exhaust system in the garage, an emergency generator, and an interface enabling emergency operation of the nearby traffic signal. Rather than locate the air handlers on top of the roof where they would have been visible, they were hung underneath the roof, above suspended acoustic ceilings.
 

Copyright Towaco Volunteer Fire Department. All Rights Reserved.