Pastilla Viagra Efectos - Buy viagra Online

Danazol 200 Mg


Danazol 200 Mg Danazol 200 Mg

Tetracycline Yellow Powder


Tetracycline Yellow Powder Tetracycline Yellow Powder

Invigorate Spa Fabric


Invigorate Spa Fabric Invigorate Spa Fabric

Hollywood Stars Accutane


Hollywood Stars Accutane Hollywood Stars Accutane

Ciprofloxacin Molecular Structure


Ciprofloxacin Molecular Structure Ciprofloxacin Molecular Structure


viagra espanol
which medicale are selling for viagra
viagra in boots chemist
viagra benefits health
effects viagra 100mg
viagra and cancer treatment
how long does viagra last for a man
if i should take viagra
how does viagra work does alcohol affect
buy viagra same day delivery
what does the word viagra mean
viagra para mujeres como se llama
fazer viagra india review
viagra contrareembolso alicante
viagra over the counter paypal ireland
does viagra show drug test
viagra super plus active
difference between viagra and tiagra
sindelafin o viagra
can viagra have side effects
bad sides of viagra
blue octogon shapep pill viagra
od jakiego wieku viagra
viagra will it make me bigger
when does viagra lose its potency
buy liquid viagra for women in hyderabad
quienes no pueden usar viagra
what you prefer viagra or cialis
kegunaan ubat viagra
difference between generic and brand viagra
erectile dysfunction imaging
viagra maintain an erection
tysabri viagra
viagra for 1.00 a pill
viagra places to buy melbourne

Home Page |  About Us |  Our Links |  Contact Us  

 

MAIN MENU
-About Us
-History
-Fire Prevention
-Announcements
-Kids Corner
-Volunteers Join Us








Welcome to the Towaco Volunteer Fire Department Information Page.
Help Us, Help You.
Please donate here and thank you for your support.


     The new Towaco Fire House replaces an existing 60-year-old fire house, which was in very poor condition. The old firehouse had proven too small for contemporary fire trucks and too costly to renovate to accommodate them. Since much of the property was situated in a flood plain and the driveway had to be close to an existing intersection, the area available for the building was geographically challenging.

     The 12,000-square-feet of area in this fully sprinkler equipped, barrier-free building is distributed over three floors. The building program consisted of two types of spaces: those associated with the day-to-day operation of this volunteer Fire Department (Apparatus Room, Departmental Offices, Equipment and Locker rooms, and Conference Room), and those associated with the building's role as a site of social gatherings and as the host of community activities. To accommodate the owner's limited construction budget, it was concluded early on that it would not be possible to finish the entire building initially. Since Fire Service could not be compromised, the finishing of the non-essential spaces was postponed. The form of the building is very simple: in Plan, a simple rectangle; in Section, a simple gable. Four large dormers bring daylight into the multipurpose room, located on the third floor, under the gable roof and it's exposed steel structure. 

     The high garage bays occupy the middle of the building, with the offices wrapping around them on the first floor, and the dormitories wrapping around them on the second. The two sets of fire stairs straddle the garage. The facade consists primarily of ground face concrete block in two colors, aligned with the glazed and unglazed portions of the garage doors, respectively. Various rooftop exhaust stacks are clustered in chimney-like enclosures at the gable ends. A cupola tops the building, bringing natural light deep into the Multipurpose Room during the day, and acting as a lantern at night. In addition to the obvious features of a fire station, the project contains a variety of special materials and systems, including greater than normal lateral resistance, as required for such a building in a seismically-active area, checker-plate traction pads, a carbon monoxide exhaust system in the garage, an emergency generator, and an interface enabling emergency operation of the nearby traffic signal. Rather than locate the air handlers on top of the roof where they would have been visible, they were hung underneath the roof, above suspended acoustic ceilings.
 

Copyright Towaco Volunteer Fire Department. All Rights Reserved.