To Make Viagra At Home - Buy viagra Online

Incendio En Costa Allegra


Incendio En Costa Allegra Incendio En Costa Allegra

Allegra Printing In Abbotsford


Allegra Printing In Abbotsford Allegra Printing In Abbotsford

Seroquel Pill Identification


Seroquel Pill Identification Seroquel Pill Identification

Allegra Richards


Allegra Richards Allegra Richards

Mg Dutasteride


Mg Dutasteride Mg Dutasteride


birmingham based company selling viagra
viagra in perth without prescription
what is the average cost of 50mg viagra walgreens
the price for one 100mg of viagra
viagra naturale omeopatico
vente viagra madagascar
cheapest viagra price
female viagra at walgreens
india made viagra
how long does it take to cum on viagra
is it legal buy viagra online
mexican jumping beans viagra
what enhances effects of viagra
biochemistry of viagra
viagra 20 years old mg
hide viagra
cuanto puede durar el efecto dela viagra
viagra vergoeding vgz
testing fake viagra
viagra make by food at home
are viagra pills dangerous
does viagra make your dick grow longer
indian viagra equivalents
viagra avaible in abu dhabi
how to use v the ultimate herbal viagra alternative
il viagra fa male ai cardiopatici
viagra contrareembolso cialis contrareembolso
it say 100 on my viagra pill
viagra get buying
viagra kopen utrecht
what does viagra cost to make
viagra comprobar codigo barras
what happens to women n viagra
does viagra work after alcohol
viagra wie teuer

Home Page |  About Us |  Our Links |  Contact Us  

 

MAIN MENU
-About Us
-History
-Fire Prevention
-Announcements
-Kids Corner
-Volunteers Join Us








Welcome to the Towaco Volunteer Fire Department Information Page.
Help Us, Help You.
Please donate here and thank you for your support.


     The new Towaco Fire House replaces an existing 60-year-old fire house, which was in very poor condition. The old firehouse had proven too small for contemporary fire trucks and too costly to renovate to accommodate them. Since much of the property was situated in a flood plain and the driveway had to be close to an existing intersection, the area available for the building was geographically challenging.

     The 12,000-square-feet of area in this fully sprinkler equipped, barrier-free building is distributed over three floors. The building program consisted of two types of spaces: those associated with the day-to-day operation of this volunteer Fire Department (Apparatus Room, Departmental Offices, Equipment and Locker rooms, and Conference Room), and those associated with the building's role as a site of social gatherings and as the host of community activities. To accommodate the owner's limited construction budget, it was concluded early on that it would not be possible to finish the entire building initially. Since Fire Service could not be compromised, the finishing of the non-essential spaces was postponed. The form of the building is very simple: in Plan, a simple rectangle; in Section, a simple gable. Four large dormers bring daylight into the multipurpose room, located on the third floor, under the gable roof and it's exposed steel structure. 

     The high garage bays occupy the middle of the building, with the offices wrapping around them on the first floor, and the dormitories wrapping around them on the second. The two sets of fire stairs straddle the garage. The facade consists primarily of ground face concrete block in two colors, aligned with the glazed and unglazed portions of the garage doors, respectively. Various rooftop exhaust stacks are clustered in chimney-like enclosures at the gable ends. A cupola tops the building, bringing natural light deep into the Multipurpose Room during the day, and acting as a lantern at night. In addition to the obvious features of a fire station, the project contains a variety of special materials and systems, including greater than normal lateral resistance, as required for such a building in a seismically-active area, checker-plate traction pads, a carbon monoxide exhaust system in the garage, an emergency generator, and an interface enabling emergency operation of the nearby traffic signal. Rather than locate the air handlers on top of the roof where they would have been visible, they were hung underneath the roof, above suspended acoustic ceilings.
 

Copyright Towaco Volunteer Fire Department. All Rights Reserved.