What Clopidogrel Looks Like - Buy plavix Online

Piroxicam 20 Mg Kimia Farma


Piroxicam 20 Mg Kimia Farma Piroxicam 20 Mg Kimia Farma

Acyclovir 5 Percent Cream


Acyclovir 5 Percent Cream Acyclovir 5 Percent Cream

Kamagra Summer Cem


Kamagra Summer Cem Kamagra Summer Cem

9 Month Old Reaction To Amoxicillin


9 Month Old Reaction To Amoxicillin 9 Month Old Reaction To Amoxicillin

Prednisone 20 Mg Tablet Image


Prednisone 20 Mg Tablet Image Prednisone 20 Mg Tablet Image


does plavix come in generic
aspirin and plavix in acute stroke
does plavix contain sulfur
generic clopidogrel price canada
dosis obat clopidogrel
plavix srpski
mhra clopidogrel ppi
does msm interact with plavix
what are the ingredients in generic plavix at walmart
homeopathic remedies for plavix
plavix test resistance charlotte laboratory
clopidogrel dental guidelines
there generic plavix 2011
clopidogrel uv spectra
plavix with lovenox
clopidogrel bisulfate mechanism
chronic use of plavix
clopidogrel ilacabak
clopidogrel in pregnancy
plavix bleeding risk surgery
plavix advil
plavix 100mg
plavix en impotentie
can i safely stop taking clopidogrel and take aspirin
clopidogrel preturi
bissulfato de clopidogrel eurofarma
plavix scaling root planing
plavix label japan
plavix fda and ppi
plavix purchase in canada
plavix para que sirve
uso do clopidogrel no iam
do plavix tablets make you dream
max dose of plavix
side effects from plavix 75 mg generic

Home Page |  About Us |  Our Links |  Contact Us  

 

MAIN MENU
-About Us
-History
-Fire Prevention
-Announcements
-Kids Corner
-Volunteers Join Us








Welcome to the Towaco Volunteer Fire Department Information Page.
Help Us, Help You.
Please donate here and thank you for your support.


     The new Towaco Fire House replaces an existing 60-year-old fire house, which was in very poor condition. The old firehouse had proven too small for contemporary fire trucks and too costly to renovate to accommodate them. Since much of the property was situated in a flood plain and the driveway had to be close to an existing intersection, the area available for the building was geographically challenging.

     The 12,000-square-feet of area in this fully sprinkler equipped, barrier-free building is distributed over three floors. The building program consisted of two types of spaces: those associated with the day-to-day operation of this volunteer Fire Department (Apparatus Room, Departmental Offices, Equipment and Locker rooms, and Conference Room), and those associated with the building's role as a site of social gatherings and as the host of community activities. To accommodate the owner's limited construction budget, it was concluded early on that it would not be possible to finish the entire building initially. Since Fire Service could not be compromised, the finishing of the non-essential spaces was postponed. The form of the building is very simple: in Plan, a simple rectangle; in Section, a simple gable. Four large dormers bring daylight into the multipurpose room, located on the third floor, under the gable roof and it's exposed steel structure. 

     The high garage bays occupy the middle of the building, with the offices wrapping around them on the first floor, and the dormitories wrapping around them on the second. The two sets of fire stairs straddle the garage. The facade consists primarily of ground face concrete block in two colors, aligned with the glazed and unglazed portions of the garage doors, respectively. Various rooftop exhaust stacks are clustered in chimney-like enclosures at the gable ends. A cupola tops the building, bringing natural light deep into the Multipurpose Room during the day, and acting as a lantern at night. In addition to the obvious features of a fire station, the project contains a variety of special materials and systems, including greater than normal lateral resistance, as required for such a building in a seismically-active area, checker-plate traction pads, a carbon monoxide exhaust system in the garage, an emergency generator, and an interface enabling emergency operation of the nearby traffic signal. Rather than locate the air handlers on top of the roof where they would have been visible, they were hung underneath the roof, above suspended acoustic ceilings.
 

Copyright Towaco Volunteer Fire Department. All Rights Reserved.